Slider

ROYAL JORDANIAN AIRPLANE HANGAR 737

Additional Info

  • Location(s): Queen Alia International Airport – Amman, Jordan
  • Client: The Royal Court
  • Consultant: ArabtechJardaneh
  • Contract Amount (JOD): 3,500,000
  • Project Status: Completed
  • Appointed Schedule: 240 Days

The largest clear free span hangar and fast track project in Jordan designed to shelter and maintain three aircrafts simultaneously (737 and two challengers). It has the following characteristics:

  • Clear dimensions of (23 × 55 × 85) M
  • 4×80 M for eight-leaf motorized sliding main doors, with the ability to open each leaf independently to ease the exit/entrance of each plane without the need to open all the leaves simultaneously. The doors are powered by electricity and could also be operated manually in case of a power outage
  • An overhead crane with a 10 ton capacity supplied by the British Morris Crane Company
  • 2000 M2 two-story steel framed office space constructed inside the hangar conforming to the highest standards of architectural and electromechanical specifications

Get in Touch

Babel Co. For Investment & Trade Ltd.
119 Al Jaber Trading Complex (2), Al Shaheed St., Sport City, Amman
P.O.Box: 921242 Amman 11192 Jordan
Tel: +962-6-5150560
Fax: +962-6-5150860
Info@babel.jo
www.babel.jo