KING
ABDULLAH II
PARK PK2

Location(S): | Amman, Jordan |
Client: | Amman Greater Municipality |
Consultant: | Al Bitar Consultants |
Contract Amount (USD): | 12,925,434 |
Project Status: | Completed |
Appointed Schedule: | 630 Days |
INFRASTRUCTURE AND LANDSCAPE WORKS – ZONE 1 & 2
King Abdullah II Park, which forms part of a triangle of metropolitan parks, is one of the key projects of the city of Amman that acts as a catalyst for the urbanization of the newly incorporated southern parts of the city. Babel was responsible for the development of third package of the new park in Amman, Jordan (with a surface of 505,000 m2). The scope of work included complete civil, infrastructure, landscape and MEP works. The area of executed playgrounds and car parking is 17,380 m2 and 43,330 m2 respectively. The project also included the execution of:
- Sport Facility
- Sport Services
- Grey Water Network
- Water / Wastewater Network
- Skatepark
- Planting Works
- Irrigation Network
- Telecommunication Network
- Firefighting Network
- Pump Station
- Storm Water Network
- Electrical Network

SCHOOL
PROJECTS
Since establishment, Babel has developed an extensive experience in constructing Educational projects, schools of different types, interdisciplinary universities, and many educational facilities. The projects included the turnkey (Civil, MEP and furniture) works of general classrooms, kindergartens, laboratories, multi-use halls, computer labs, science labs, workshops and administrative spaces. Moreover, Babel has successfully executed multiple sport facilities projects that consisted of but not limited to outdoor playing fields, multi-function gymnastic sport halls and Olympic swimming pool.

USAID Funded School Projects
Location(S): | Multiple |
Consultant: | Al Bitar Consultants |
Contract Amount (USD): | 14,916,390 |
Project Status: | Completed |
Appointed Schedule: | 270 Days |

Royal Grant School Project
Location(S): | Zarqa |
Consultant: | Sabeel al-Handasah |
Contract Amount (USD): | 8,321,579 |
Project Status: | Completed |
Appointed Schedule: | 180 Days |

King Abdullah II School for Excellence
Location(S): | Salt |
Consultant: | Ministry of Public Works |
Contract Amount (USD): | 4,231,311 |
Project Status: | Completed |
Appointed Schedule: | 180 Days |
DOCUMENT
CENTER
UNIVERSITY OF JORDAN
In celebration of the 42nd anniversary of University of Jordan establishment, his Majesty King Abdullah II inaugurated the document centre building in the year 2012. This state of art 3000 m2 building consists of four floors covered with Nabati poetry installed using GRC panels cladding. Babel was responsible for the civil, architectural, interior, landscape and MEP that included:
- Yellow Ajloun acid-treated stonewalls for facades and external works with an approximate total area of 3,150 m2.
- Fixed and movable glass facades with an approximate area of 345 m2.
- Skeletal tops made of vacuum metal with an approximate area of 500 m2.
- GRC facades and decorations with an approximate area of 1,400 m2.
- External works with an approximate total area of 750 m2.



DOCUMENT CENTER Funded School Projects
Location(S): | The University of Jordan. Amman-Jordan |
Consultant: | Kayyali & Fasheh Architects & Engineers |
Contract Amount (USD): | 2,892,064 |
Project Status: | Completed |
Appointed Schedule: | 365 Days |
SENTATE
ADMINISTRATIVE
BUILDING
Through our extensive experience in public sector projects and a profound sense of civic responsibility, Babel has executed multiple of local landmarks across the country. The new Senate Administrative Building, located in Abdali – Amman, consist of three floors with a total area of 5000 m2. Maintaining the architectural heritage of the old Senate Building was an important aspect in the design and the turnkey construction of this project. As part of our commitment to the sustainable development of our country, Babel was responsible for the design, installation and commissioning of 300 kWp roof-mounted Photovoltaic System.



SENATE ADMINISTRATIVE BUILDING
Location(S): | The New Administrative Building for Senate |
Consultant: | SIGMA Architects & Engineers |
Contract Amount (USD): | 5,640,000 |
Project Status: | Completed |
Appointed Schedule: | 365 Days |
THE FACULTY
OF SCIENCE AND
LABORATORIES
AL-HUSSEIN BIN TALAL UNIVERSITY
Babel’s extensive portfolio extends over 30 years of constructing educational projects, working with major clients in the field around Jordan. We successfully implemented projects for schools of different types, interdisciplinary universities, and many educational facilities. The Faculty of Science and Laboratories was established in 2018 as the newest college in Al-Hussein Bin Talal University, apublic coeducational university located in the heart of the southern region, 210 km from the Capital Amman. The building consists of four floors with a total area of 10,000 m2. Our scope covered all Civil, MEP, Finishing, and laboratories works as well as external works and landscape.


SENATE ADMINISTRATIVE BUILDING
Location(S): | Ma’an, Jordan |
Client: | Al- Hussein Bin Talal University |
Consultant: | Holy Rock Engineering Office |
Contract Amount (USD): | 5,844,697 |
Project Status: | Completed |
Appointed Schedule: | 730 days |
GHOR SAFI
HOSPITAL
EXPANSION
& RENOVATION
To begin with the construction works that provided a total of 67 hospital beds for Ghor Safi hospital, the project team had to coordinate and liaise with the Ministry of Health and the Hospital staff on a zone management-based construction schedule. The purpose was to maintain ongoing medical operations while renovating the existing hospital building. The project also included a 3200 m2 turnkey expansion connected to the existing building, 2400 m2 external works, and medical equipment installation.



GHOR SAFI
Location(S): | Ghor Safi, Jordan |
Client: | The Ministry of Public Works and Housing Housing |
Consultant: | Al Baha Consultant Engineering |
Contract Amount (USD): | 5,217,000 |
Project Status: | On Going |
Appointed Schedule: | 450 Days |
RJAF MILITARY
BASE AL-GHABAWI
DESIGN AND BUILD PROJECT
This project is one of Babel’s impressive track record in the Fast Track construction projects. Creating synergy between constructability and value engineering designs was the base of Babel’s strategy while executing this Design and Build project. The project consisted of the complete development of a military base from infrastructure up to finishing works. The military base includes:
- Road works and infrastructure (electrical, mechanical and telecommunication) connecting the main entrance to 10 separate buildings with an approximate total area of 10,000 m2.
- Fire station and Airport Control Tower building.
- Gas station with diesel, petrol and airplane fuel tanks.


RJAF MILITARY BASE
AL-GHABAWI
Location(S): | Ghabawi – Amman, Jordan |
Client: | Royal Jordanian Air Force |
Consultant: | Royal Jordanian Air Force |
Contract Amount (USD): | 3,451,680 |
Project Status: | Completed |
Appointed Schedule: | 120 Days |
Related Projects
Contact Us
Babel Contracting Company
119 Al Jaber Trading Complex (2), Al Shaheed St., Sport City, Amman
P.O.Box: 921242 Amman 11192 Jordan