ROYAL JORDANIAN
AIRPLANE
HANGAR A340

Location(S): | Queen Alia International Airport – Amman, Jordan |
Client: | The Royal Court |
Consultant: | Directorate of Airports Engineering |
Contract Amount (USD): | 3,948,00 |
Project Status: | Completed |
Appointed Schedule: | 240 Days |
The Aircraft Hangar was bound to handle “A check” level and unscheduled maintenance works, such as change of engine, Auxiliary Power Unit (APU), landing gear and others, for all Royal Jordanian Airplanes A340. It was designed to be one of the largest free span aircrafts in Jordan with an approximate total area of 5000 m2 and clear dimensions of 72*72*26 m.
The aircraft hangar structure was designed and imported from Kirby Building Systems, which is one of the largest pre-engineered steel building (PEB) companies in the world and constructed as below:
- Sandwich panel cladding.
- Motorized hangar door (18.5 × 70m), designed and supplied by Spec-Door.
- Suspended overhead crane with a capacity of 6.3 tons and hook height of 18.5 m that
- covers the whole hangar span, supplied by Morris Crane-UK.
- An independent foam firefighting system.
- A concrete corridor connection to the taxiway with a total area of 12,000 m2, with
- directional lighting installed for the runway and 25m high light towers for general lighting.
- Two floors annex buildings for administrative office.
ROYAL JORDANIAN
AIRCRAFT HANGAR
BOEING 737

Location(S): | Queen Alia International Airport – Amman, Jordan |
Client: | Royal Jordanian |
Consultant: | Directorate of Airports Engineering |
Contract Amount (USD): | 4,935,000 |
Project Status: | Completed |
Appointed Schedule: | 240 Days |
This project was designed to be the largest clear free span Aircraft Hanger. We implemented a fast-track construction scheduling technique, which was used to reduce the overall duration of projects by overlapping tasks. With an approximate total area of 5000 m2, this aircraft hangar can shelter and maintain three airplanes simultaneously (Boeing 737 and two challengers). The aircraft hangar structure was designed and imported from Kirby Building Systems, which is one of the largest pre-engineered steel building (PEB) companies in the world, and was constructed as below:
- Clear dimensions of (85 × 55 × 23 m).
- 80×4 m eight-leaf motorized sliding main doors, with the ability to open each leaf independently.
- An overhead crane with -10ton capacity supplied by the British Morris Crane Company.
- 2000 m2 two-story steel structure annex office space.
STEEL STRUCTURE
WAREHOUSES

Location(S): | Sahab – Amman, Jordan |
Client: | Jordan Industrial Estates Corporation JIEC |
Consultant: | Madi and Partners Consulting Engineers |
Contract Amount (USD): | 3,622,290 |
Project Status: | Completed |
Appointed Schedule: | 240 Days |
STEEL STRUCTURE HANGER SIN SAHAB AND MUWAQAR INDUSTRIAL ESTATE
Capitalizing on our expertise and combined specialization in Installation Works of Industrial Facilities along with Steel structures, Babel’s professional team of structural and mechanical engineers are deeply dedicated to their research and analysis of every individual project regardless of size, location, and prominence. We stripe to offer our clients value engineering design solutions using conscious and explicit set of disciplined procedures designed to seek out optimum value for both initial and long-term investment. Our experience exceeds the complete execution of more than 200,000 m2 steel structure warehouses and industrial facilities including excavation, civil, and MEP scopes.
Location(S): | Muwaqar – Amman, Jordan |
Client: | Jordan Engineers Association JEA |
Consultant: | Holy Rock Engineering Office Consultation Engineers |
Contract Amount (USD): | 2,378,670 |
Project Status: | Completed |
Appointed Schedule: | 000 Days |
JORDANAMCO
FACTORY
With our remarkable engineering team of experienced and creative professionals, Babel strives to offer clients contemporary and innovative solutions that fulfil their aspirations and achieve their goals. Jordan Advance Machining Company (JordanAMCO), one of KADDB Investment Group (KIG), workshop was constructed with a total area of 3000 m2 using sandwich panel covered steel structure installed with a specialized firefighting system. Attached to the workshop, a two-story administrative building was constructed with high-end finishing and an architectural curtain wall facade. We have also implemented the external works including, asphalt areas, retaining wall, fences and main gate. The factory was constructed to accommodate the production of the following products:
• Defence applications
• Turrets & metal sheet forming
• Civilian & extractive industries
• Spare part & customised products


Location(S): | KADDB Duty-Free Zone – Al Dhulail, Jordan |
Consultant: | Jordan Advanaced Machining Company (JAMCO) |
Contract Amount (USD): | 3,102,000 |
Project Status: | Completed |
Appointed Schedule: | 240 Days |
LOYALTY
SUPPORT
SERVICES
(LSS)
Babel is distinguished from its competitors in the market of Steel Structures industry, by being also specialized in the Installation Works of Industrial Facilities. In this project our scope exceeded the fabrication and erection of the 2,800 m2 storage and production facility, we were also responsible for the complete installation of the cooking production line.
Connected to the production facility, our scope also included the execution of approximately 6000 m2 built up area consisting of administrative offices, staff dormitory, and raw materials storage rooms on 8000 m2 plot of land.



LOYALTY SUPPORT SERVICES
Location(S): | Al Qastal – Amman, Jordan |
Client | Zad Industries and Services LLC. |
Consultant: | Arabtech Jardaneh |
Contract Amount (USD): | 2,679,000 |
Project Status: | Completed |
Appointed Schedule: | 240 Days |
MADABA
GYMNASIUM
HALL
Having a professional Steel Structure Fabrication and Erection teams along with technical engineers with demonstrated history in Steel Structure works in sports construction industry, was exemplified in this project.
Madaba Gymnasium hall included indoor professional sports area and offices extensions. The hall was constructed using Steel Structure covered with sandwiched panels with an approximate area of 2,000 m2. It encompasses wood molded steel grandstands, rubber floors and parquet floors for the squash courts; in addition to all MEP works (internal and external lighting, firefighting system, audio system, and sewage lines). Our work also included the external part of the gymnasium, which included high retaining walls with paved roads covering a total area of 3,700 m2.


MADABA GYMNASIUM HALL
Location(S): | Madaba Sports City, Jordan |
Client: | The Higher Council of Youth |
Consultant: | Al Bahah for Engineering Consultations |
Contract Amount (USD): | 2,397,000 |
Project Status: | Completed |
Appointed Schedule: | 365 Days |
THE VERTICAL
EXPANSION
TO THE EXISTING
ISTISHARI HOSPITAL
Fabrication and erection of metal structures consisting of 700 tons’ iron sections coated with cementitious fire resistance painting for the vertical expansion of two floors for the existing building of Istishari hospital. The structural works included 5000 m2 reinforced concrete slab works above 0.7mm corrugated metal sheets. In addition to internal block partitions and external stove facades during the construction work, Babel was responsible to establish and maintain all of the necessary protection requirements for the existing operating hospital.


VERTICAL EXPANSION TO THE EXISTING ISTISHARI HOSPITAL
Location(S): | Amman, Jordan |
Client: | Istishari investment group |
Consultant: | S.M.Dudin Architects & Engineers |
Contract Amount (USD): | 2,256,000 |
Project Status: | 360 Days |